Fillable checklist
Deck Inspection Checklist: Ledger, Guards, and Stairs (Free Printable PDF)
Fillable visual deck and porch form for ledger, flashing, joists, posts, footings, guards, stairs, and boards. Print blank or save a filled PDF.
Snugage fillable checklist
Fill this on screen, then download a PDF or CSV. Download a blank copy to complete by hand. Answers stay in this tab only. The next visitor sees a blank form. This is a visual deck and porch inspection of a US house: ledger and flashing, joists and beams, posts and footings, guards and handrails, stairs, boards, and fasteners. Mark N/A on stations the deck does not have.
- 9 sections
- 60 checks
- Blank for each visitor
Export
References
- InterNACHI Home Inspection Standards of Practice, section 3.2 Exterior (decks, porches, railings, guards, stairs)
- InterNACHI, Why Home Inspectors Should Know Code Requirements for Guards (36-inch height and 4-inch sphere)
- InterNACHI, How to Perform Deck Inspections (ledger, flashing, posts, footings, stairs, fasteners)
- ASHI Standard of Practice for Home Inspections, 2026 approved text, section 5 Deck and Balcony
- ASHI Standard of Practice (current page and 2026 implementation note)
- ASHI Auxiliary Standard of Professional Practice for Residential Deck Inspections (flashing, ledger, floor system, posts, guards, stairs)
- International Residential Code, 2021 IRC Chapter 5 Floors, section R507 Exterior Decks (ledger, flashing, joists, posts, footings, fasteners)
- Texas IHB Residential Code 2021 (IRC 2021) Chapter 5 Floors, section R507 Exterior Decks
- Texas IHB Residential Code 2021 (IRC 2021) Chapter 3 Building Planning, R311.7 stairs and R312.1 guards
- UpCodes, IRC guards and window fall protection (36-inch height, 30-inch trigger, 4-inch sphere; 2024 R321 / 2021 R312)
Printable checklist PDF and image
Blank printable PDF and a preview image of this checklist.
These checklists are provided for general reference only. Always verify the steps against local codes, a licensed inspector or a qualified contractor before relying on them, especially for safety-critical work.