Fillable checklist
Siding Inspection Checklist: Cladding Trim and Moisture (Free Printable PDF)
Fillable visual siding inspection for a US house: vinyl, fiber-cement, wood, stucco or EIFS, trim, flashing, and grade clearance. Print blank or save a filled PDF.
Snugage fillable checklist
Fill this on screen, then download a PDF or CSV. Download a blank copy to complete by hand. Answers stay in this tab only. The next visitor sees a blank form. This is a visual exterior cladding inspection of a US house: vinyl, fiber-cement, wood, stucco or EIFS if visible, trim, flashing, penetrations, and grade clearance. Mark N/A on cladding types the house does not have.
- 9 sections
- 58 checks
- Blank for each visitor
Export
References
- InterNACHI Home Inspection Standards of Practice, section 3.2 Exterior (wall-covering materials, flashing, trim; items not visible from the ground)
- InterNACHI International Phase I Standards of Practice for Inspecting Exterior Wall Cladding (type, damage, detailing at grade, roofs, decks, penetrations)
- InterNACHI, Vinyl Siding Inspection (face nailing, expansion gaps, fastener slot, J-molding, mounting blocks)
- ASHI Standard of Practice for Home Inspections, section 4 Exterior (2026 approved text: wall coverings, flashing, trim; limitations)
- ASHI Standard of Practice (current page, wall covering definition and exterior duties)
- International Residential Code 2024, Chapter 7 Wall Covering (R703 envelope, WRB, vinyl clearance, flashing, wood, stucco, EIFS, fiber-cement)
- International Residential Code, protection of wood against decay (untreated wood siding 6 inches to ground or 2 inches above a weather-exposed slab)
- City of Bellaire, Texas, IRC R317 Protection of Wood and Wood-Based Products Against Decay (same 6-inch and 2-inch wood siding clearances)
- Minnesota Department of Labor and Industry, Re-siding and the 2020 Minnesota Residential Code (WRB, flashing locations, kickout flashing)
- Vinyl Siding Institute, 2020 Vinyl Siding Installation Manual (fastener gap, expansion, no face-nail, J-channel 1/2 inch from roofing)
- James Hardie HardiePanel installation instructions (Home Depot OEM PDF: 2-inch roof and deck clearance, 1/4-inch flashing gap, kickout, no standing water)
- EPA, A Brief Guide to Mold, Moisture and Your Home (moisture control, dry wet areas within 24 to 48 hours, grade away from the building)
- EPA, Moisture Control Guidance for Building Design, Construction and Maintenance (cladding, drainage plane, flashing at penetrations)
- ENERGY STAR Single-Family New Homes National Water Management System Builder Requirements, Rev. 13 (bottom-of-wall flashing, drainage plane, kick-out, siding above roof)
- DOE Building America Solution Center, Drainage Plane Behind Exterior Wall Cladding
- Maricopa County, Arizona, Weep Screed directive DD-5004-01 (IRC R703.7.2.1: 4 inches above earth or 2 inches above paved areas; weeps not covered)
Printable checklist PDF and image
Blank printable PDF and a preview image of this checklist.
These checklists are provided for general reference only. Always verify the steps against local codes, a licensed inspector or a qualified contractor before relying on them, especially for safety-critical work.